
Currently Available Tool Downloads
S.P.A.C.E. PROCUREMENT MATURITY DIAGNOSTIC [ FREE PDF DOWNLOAD ]
Self-Assessment Worksheet for Public Art Procurement Architectures
FUTURE Tool Downloads
Hybrid Jury Evaluation Architecture Outline: Structural reference sheet detailing the 7-juror cohort model (50% Technical / 25% Community / 25% Operational).
Hybrid Jury Baseline Scoring Sheet: Printable, structured evaluation ledger for manual panel tabulations.
Roadmap of Bilateral Right of Integrity Covenant Use.
Advanced Hybrid Jury Calculation Engine (.xlsx): Automated spreadsheet pre-programmed with intra-lane fractional normalization formulas and the 75% minimum expert score safety valve.
Individual Contract Modules (.docx): Single-asset legal riders (e.g., standalone Bilateral Right of Integrity Covenant or the Inter-Departmental SLA Template).
Site Governance & Estimation Tools: Standalone Schedule C / P70 Estimation Confidence Limit Models and SIT Engineering Close-Out Gate Checklists.
The Master Three-Phase Dynamic Contract Suite: Fully editable (.docx) contract architectures covering Phase 1 (Discovery & Ideation), Phase 2 (Schematic Design & Engineering), and Phase 3 (Construction Administration & Delivery). Includes Sub-Modules A, B, & C.
Every Operational Sub-Clause & Rider: Complete boilerplate text for all mechanisms mapped in the book; including the Bilateral Right of Integrity Covenant, the 5-to-7-Day Bilateral Collaboration Rider, the Studio-Door Liability Shift Partition, Foreign Exchange Indexing, and the Structural Indemnity Transfer (SIT) Gate.
PHASED RELEASE SCHEDULE
PHASE II
Target Date: November 2026
Amazon Kindle, EPUB & Master Digital Bundle. Digital publication across Amazon KDP and universal e-reader distribution channels.
○ In Production
PHASE III
Target Date: Rolling Q4 2026
Toolkit & Boilerplate Suites
Scorecards, 3-phase dynamic contract suites, and itemized administrative schedules.
◐ Active Staging